  Building Status
 
    The new parish center and gymnasium for St. Charles Borromeo is now under construction.

Most recent activity:

  • The exterior CMU walls are complete.

  • The metal structural steel and roof decking are installed over the gymnasium.

  • The structural steel has been installed around the worship area.

  • The glu-lam roof structure is in progress of being installed.

  • The steel cross has been installed on the east side of the building.

  • The metal stud framing on the exterior walls is progressing and they have started on the south side of the worship area and are continuing around on the east side of the building.

  •